Design-assist & permitting
Load calcs, Title 24 compliance, and stamped mechanical drawings coordinated with your architect.
Tenant improvement HVAC · Southern California
We design-assist, install, and turn over commercial HVAC for restaurants, retail, fitness, medical, and office build-outs — sized to the space, coordinated with the GC, and finished on the date in the schedule.
One contractor from load calcs to final air balance, so the GC has a single point of contact for everything above the ceiling.
Load calcs, Title 24 compliance, and stamped mechanical drawings coordinated with your architect.
Rooftop units, split systems, VAV, and custom sheet metal, fabricated and installed by our crews.
Type I and II hoods, makeup air, and grease duct for restaurant tenants, built to inspection.
Startup, TAB reports, controls checkout, and closeout docs ready for the landlord.
Programmable and networked controls tied to the base-building BMS where required.
Warranty service and preventive maintenance once the tenant is open for business.
A set process means fewer RFIs and no surprises at final inspection.
Send the drawings. We walk the existing conditions and flag base-building gaps early.
An itemized number inside 48 hours, with alternates that hold the budget.
Our own crews, coordinated with the GC's schedule and the other trades.
Balance, inspect, and hand over closeout docs so the tenant opens on time.
Tell us about the space. We'll reply with questions or a number, usually within two business days.